Project 01
Trailer Maintenance Shop — East Houston
Material DeliverySurface GradingVegetation RemovalGravel CompactionSlope Adjustment
A 43,771 ft² trailer maintenance shop yard in East Houston. GO-BIN SERVICES delivered limestone-based gravel, removed existing vegetation, graded the surface, adjusted existing slopes, and compacted the finished gravel base.
- Size
- 43,771 ft²
- Material
- Limestone-based gravel

